AUSTRALIA & NEW ZEALAND SHIPPING
SECURE CHECKOUT
AUSTRALIAN OWNED
FREE SHIPPING OVER AU$70*

Single Sleeping Bag 213cm – 3-4 Season Pink

4.9
AU$42.90
Or 4 interest-free payments of AU$10.73 with Afterpay Learn More
Estimated delivery: 14 October – 24 October
American ExpressMastercardPayPalVisaAfterpay
Australia & New Zealand delivery
30-day returns
12-month warranty

Stay comfortable across three to four seasons with this single sleeping bag, designed to handle temperatures from -5°C to 20°C and give adults plenty of room to stretch out at 213cm long. The 500gsm hollow fibre filling, 190T polyester ripstop shell and soft polyester pongee lining work together to keep you warm without feeling heavy or restrictive.

A two-way zipper at the foot end allows easy ventilation on warmer nights, while the adjustable drawstring hood helps lock in warmth when temperatures drop. It packs down into the included carry bag, making it easy to throw in the back of the car or strap to a pack for hiking trips.

Specifications

  • Colour: Pink
  • Material: 190T polyester ripstop
  • Filling: 500gsm hollow fibre
  • Lining: Polyester pongee
  • Temperature rating: -5°C to 20°C (listed by supplier)
  • Dimensions: 213 x 75cm
  • Season rating: 3–4 season
  • Features: Two-way zipper, adjustable drawstring hood, water-resistant, secure velcro closure, carry bag included

What’s Included

  • 1 x single sleeping bag
  • 1 x carry bag
Weight 2.100 lbs

"Arrived earlier than quoted, Thank you Just Camp for the great service"

★★★★★

Ross

"Website was easy to navigate and I received my purchase promptly"

★★★★★

Brenda

"Purchased for a great price, service was excellent, postage very quick"

★★★★★

Lindy

"Great product and service A++"

★★★★★

Anthony

"My order arrived faster than expected and the quality was just as good as the big name brands"

★★★★★

Aaron

Customer Reviews

评价

目前还没有评价

成为第一个“Single Sleeping Bag 213cm – 3-4 Season Pink” 的评价者

您的邮箱地址不会被公开。 必填项已用 * 标注

Campfire gathering

JOIN THE JUST CAMP TRIBE

Join the Just Camp Tribe and get a special discount on your first order.

You'll also get early access to new products, camping deals, outdoor tips and exclusive offers.

Join the Tribe

Free to join • Exclusive offers • Unsubscribe anytime

Your cart

Your cart is empty

Continue shopping